Solomenskaya street 11, Kyiv, Ukraine
Business Center Eleven is in Solomyansky district of Kyiv in the nearest proximity to Solomyansky park.
BC Eleven has excellent accessibility by car and public transport: the distance from the Project to the city center is less than 5 km. In addition to developed network of public transport routes available to the residents of the office complex, the Project offers shuttle bus services from / to “Palats Ukraina” and “Universitet” metro stations.
Solomyansky park with its terraces and landscaping provides tenants with a great view from their offices. The abundance of greenery and recreational areas on the territory of the business center creates a cozy atmosphere for work and leisure.
In addition to excellent views and effective planning solutions, the Project has a well-developed infrastructure. The complex will be supplied with more than 1,000 ground and structured parking lots, a conference hall, a fitness center.
The choice of different food concepts, including already operating Dinner`s canteen, Lucca Italian restaurant, and Par Bar Asian restaurant, is the essential part of the concept.
The business center includes 2 operating buildings with an area of over 14,000 sq m.
Two new office blocks to be commissioned in Q2 2021.
Building 3
Gross leasable area – 10,936 sq. m
12 floors
Typical floor area – 1,200 sq. m
Elevators: 5 passenger elevators; 1 cargo elevator
Typical floor plan
Building 4
Gross leasable area – 5,554 sq. m
5 floors, 5 structured parking levels
Typical floor area – 1,360 sq. m
Elevators: 3 passenger elevators; 1 cargo elevator; parking elevator to the 1st floor
Typical floor plan
Technical specifications
The buildings will be equipped with modern engineering systems: chiller-fan coil central air conditioning system; supply and exhaust ventilation system with air recovery; fire alarm system adjusted for open space layout; sprinkler fire extinguishing system. The ceiling height from lap to lap is 3.6 m. The facility has 2 independent power supply inputs, with a total capacity of 1.4 MW for 2 new buildings. There is an opportunity to install raised floor and diesel generator.